After the electrical was done I turned to the kitchen and bathroom plumbing with pex pipe, fittings, and copper pipe for the water heater pressure relief valve. Then I started on the bathroom cabinets - one to hide the plumbing of the sink, the run to the kitchen, and one for the potty box to hide the bucket I intend to use with wag bags.
Laminated toilet top without hole cut out. |
Toilet box with lid that lifts up for removal of bucket contents. |
Sink cabinet frame unfaced. |
No comments:
Post a Comment