Tuesday, April 9, 2019

Post #29 - Ceiling, joists and vent holes

Last week despite the rain and cool weather, we managed to get the rest of the panels shellaced and installed.  Every rafter was attached with two 3" screws and the paneling was stapled with 3/4" long, X 15/16" wide staples. Shouldn't be going anywhere.  The front cabinet was screwed into the paneling for strength along the top and middle.  Still need to put the top board on it, but have to shellac it first. I also cut out the living room vent hole and the hole for the upper refrigerator vent. Tomorrow I'll have to cut out the vent hole in the bathroom ceiling, and put pounding more twisty nails through the paneling into the rafters. 




After everything is nailed in and cut out the next item to do is running the 120 v and 12v wiring so I can add the curbing to the edges, and insulation from front to back.

No comments:

Post a Comment