Post # 18 - Marmoleum flooring

After the floor leveler dried for a week while I was camping at Hailey. Idaho with some of my Sisters On the Fly friends, I could finally turn my attention to the marmoleum floor installation.

First we unrolled the flooring and laid it down on the trailer floor so it would stretch and flatten out for a few nights.
Then we cut the Marmoleum sheet to length and cut the wheel wells out, and let it lay and stretch out for another day.  

Today we went out and glued it down, first the street side, then the curb side.  After rolling repeatedly we added weight to the edges, and clamped some 1 1/2" boards to the edges, and rolled again.  Tomorrow I will roll again, cover the flooring with RAMboard, plus heavy craft paper to protect it through out the rest of the build. 

Done for today - more later.